Description
Hardware & Electrical Specifications
- Model:PFSK151
- Part Number:3BSE018876R1
- Module Type:Fiber‑Optic Communication Module
- Mounting:DIN‑rail mount, inside control cabinet
- Power supply:24 V DC, power consumption 8 W
- Optical interface:2‑channel duplex fiber port, ST‑type fiber connector
- Transmission medium:Multimode optical fiber
- Max transmission distance:2000 m
- Data rate:10 Mbit/s
- Galvanic isolation:Complete electrical isolation via optical fiber
- On‑board protection:ESD protection, surge suppression for electrical side
- Compatibility note:Cannot run standalone; matched with ABB PFSK series optical modules and Advant controller hardware; firmware version matching is required.
Environmental Specifications
- Operating temperature:0 ℃ ~ +60 ℃
- Storage temperature:‑40 ℃ ~ +85 ℃
- Relative humidity:5%‑95% non‑condensing
- Installation location:Indoor industrial control cabinet
- EMC compliance:IEC 61000‑6‑2
- Certifications:CE
Mechanical Data
- Weight:approx 0.32 kg
- Dimension:125 mm × 100 mm × 45 mm
- Terminals:Screw terminals for 24 V power supply and electrical bus signals
- Recommended wire cross‑section:0.75 mm²‑2.5 mm² copper cable
- Terminal tightening torque:0.6‑1.0 N·m
Main Functions
- Convert electrical bus signals to optical signals for long‑distance communication.
- Receive optical signal and convert back to electrical signal for controller interaction.
- High anti‑interference performance, suppress ground loop and strong electromagnetic disturbance.
- Support point‑to‑point duplex communication for Advant field‑bus extension.
- Module self‑diagnosis: detect power failure, fiber break, link loss, report fault status.
- LED status indication:
- Green LED:Power supply normal, module healthy
- Yellow LED:Optical link communication active
- Red LED:Fiber fault / link loss / module hardware fault
Installation & Wiring Requirements
- Cut off cabinet power before installation or replacement. Mount PFSK151 firmly on DIN‑rail. Hot‑swap is forbidden.
- Connect 24 V DC power and bus signal wiring strictly per wiring diagram; keep fiber cable separate from high‑power cables.
- Keep ST fiber connector clean, avoid dust and mechanical damage to fiber end‑face.
- Complete system grounding according to ABB Advant system specification.
- After replacement, verify optical link communication status; confirm controller data exchange is normal before commissioning.
- Replacement note: Check firmware compatibility; optical link loss test is required after replacement.



-300x300.jpg)



Reviews
There are no reviews yet.