Description
Hardware & Electrical Specifications
- Model:XVC769AE101
- Part Number:3BHE006373R0101
- Module Type:Optical Excitation Interface Board (OEI‑Board)
- Bus Interface:Internal converter system back‑plane signal bus
- Signal Channel:Multi‑channel fiber‑optic trigger output ports, fiber‑optic status feedback input channels
- Power supply:24 V DC (18‑32 V DC)
- Max power consumption:10 W
- Galvanic isolation:≥2500 V AC between power‑unit optical side and control‑logic side
- Dielectric strength:2500 V AC 1 minute
- Insulation resistance:>100 MΩ @ 500 V DC
- On‑board protection:ESD protection, surge suppression, hardware fault latch circuit, conformal coated PCB
- Compatibility note:Cannot run standalone; dedicated for ACS6000 / Megadrive‑LCI converter rack, must match corresponding system firmware version.
Environmental Specifications
- Operating temperature:‑10 ℃ ~ +60 ℃
- Storage temperature:‑40 ℃ ~ +85 ℃
- Relative humidity:5%‑95% non‑condensing
- Installation location:Inside high‑power converter cabinet rack
- EMC compliance:IEC 61000‑6‑2
- Certifications:CE
Mechanical Data
- Installation:Plug‑in rack‑mount eurocard board
- Interfaces:Internal back‑plane connector; front‑panel multi‑channel fiber‑optic ports
- Recommended wire cross‑section:0.75 mm²‑2.5 mm² copper cable for auxiliary signal terminals
- Terminal tightening torque:0.6‑1.0 N·m
- Weight:approx 0.75 kg
- Dimension:Standard Euro‑card for ABB high‑power converter rack
Main Functions
- Encode trigger timing commands from main processor, convert electrical signals into optical firing pulses for IGCT power units.
- Receive optical status feedback signals from power semiconductors, convert optical signals back to electrical logic signals.
- High‑voltage galvanic isolation via fiber‑optic link, suppress heavy electromagnetic interference between control rack and power cabinet.
- Hardware fault latch: capture trigger loss and power‑unit feedback fault, output fault status to main control board.
- Board‑level self‑diagnosis: monitor on‑board power‑supply and internal logic circuit, report hardware alarm codes to converter system.
- LED status indication:
- Green LED:Power supply normal, board logic healthy
- Yellow LED:Optical trigger / feedback signal active
- Red LED:Trigger channel fault / power‑unit feedback fault / board hardware fault
Installation & Wiring Requirements
- Cut off cabinet total power before replacement. Insert XVC769AE101 into assigned rack slot and tighten mounting screws. Hot‑swap is strictly forbidden.
- Connect optical fibers strictly according to marking definition; separate high‑power cables and weak‑signal cables to reduce electromagnetic interference.
- Cabinet protective grounding shall comply with ABB ACS6000 / Megadrive‑LCI grounding specification.
- After replacement, confirm firmware compatibility, complete trigger pulse test and power‑unit feedback verification before commissioning.
- Replacement note: Cross‑version substitution requires hardware‑firmware compatibility validation.




-300x300.jpg)

Reviews
There are no reviews yet.