Description
Hardware & Electrical Specifications
‑ Model: DS200CTBAG1ADD ‑ Part Number: DS200CTBAG1ADD ‑ Module Type: Mark V / EX2000 Terminal PCB BoardDirect Tur… ‑ Mounting: Screw‑fastened installation inside Mark V control cabinet ‑ Connectors: • Dual stacked removable field‑wiring terminal blocks • COREBUS system bus headers (JAI, JAJ) • 1 × 9‑pin D‑sub RS‑232 diagnostic serial port • Multiple BNC coaxial signal connectors ‑ Signal types: Analog input, analog output, discrete control and feedback signals ‑ Power supply: Powered from Mark V rack backplane ‑ On‑board protection: Surge‑suppression components for field‑side noise immunity ‑ PCB treatment: Industrial conformal‑coated multilayer circuit board ‑ Compatibility note: Designed for GE Speedtronic Mark V and EX2000 excitation system, not drop‑in compatible with Mark VI / Mark VIe. After replacement, verify terminal block wiring consistency, secure all bus and field connectors, perform loop signal testing and confirm controller I/O status readings.
Environmental Specifications
‑ Operating temperature: 0 ℃ ~ +60 ℃ ‑ Storage temperature: −40 ℃ ~ +85 ℃ ‑ Relative humidity: 5%‑95% non‑condensing ‑ Installation location: Indoor control cabinet, Pollution Degree 2, IP20 ‑ EMC compliance: Industrial EMC requirements for power‑generation turbine‑control equipment ‑ Certifications: CE, UL compliant for power‑plant control‑system components
Mechanical Data
‑ Board dimension: 286 mm × 70 mm ‑ Mounting: Four‑point screw fixing onto cabinet card rack ‑ Weight: approx 0.36 kgMoore Auto…
Main Functions
- Provides field‑wiring termination and signal routing between Mark V / EX2000 control hardware and external field sensors, actuators and excitation‑system devices. Integrates surge‑suppression circuits to mitigate plant‑site electromagnetic interference.
- COREBUS connectors transfer processed I/O signals to main controller boards. RS‑232 serial port supports local diagnostic connection for commissioning and troubleshooting. BNC connectors handle high‑speed analog measurement signals.
- No dedicated on‑board LED array; signal health and fault conditions are monitored via main controller diagnostic menus and system alarm logs.
Installation & Wiring Requirements
- Cut off full rack power supply before installation or replacement. Non‑hot‑swappable. ESD wrist‑strap protection is mandatory during board handling.
- Secure DS200CTBAG1ADD to cabinet rack with mounting screws. Double‑check every field‑wiring terminal assignment matches original drawing. Fasten COREBUS headers, RS‑232 port and BNC signal connections.
- All field wiring shall strictly follow Mark V / EX2000 system wiring drawings. Reliable protective‑earth connection for control cabinet is mandatory.
- After replacement: Restore rack power supply. Verify controller I/O point status. Perform signal‑loop injection tests for critical excitation and turbine‑protection channels. Confirm interlock and protection‑logic responses.
- Replacement note: Wrong terminal wiring will cause excitation mis‑operation or false turbine trips. Full‑system commissioning and protection‑logic verification test is mandatory before putting turbine‑generator control into service.


-1-300x300.jpg)


-1-1-300x300.jpg)
Reviews
There are no reviews yet.