Description
Hardware & Electrical Specifications
‑ Manufacturer: GE General Electric ‑ Compatible System: Speedtronic Mark‑V Turbine Control ‑ Functional Acronym: TCTG (Simplex Turbine Trip Board) ‑ Power Supply: 24 VDC operating power ‑ On‑Board Relays: 21 plug‑gable safety relays for trip‑output and signal‑interlock circuits ‑ Connectors: 3 ×50‑pin ribbon‑cable headers, 2 ×12‑pin inter‑board connectors for core‑signal and solenoid‑wiring interface ‑ On‑Board Jumpers: Configurable jumpers for trip‑logic hardware setup. All jumper positions must be exactly duplicated during replacement ‑ Indicators: LED status indicators for relay and trip‑circuit diagnostic monitoring ‑ PCB Finish: Conformal coated multilayer FR‑4 PCB ‑ Compatibility Restriction: Works only for Mark‑V systems; not compatible with Mark‑VI / Mark‑VIe control racks. Relay part numbers must match original specifications.
Environmental Specifications
‑ Operating Temperature: 0 °C ~ +60 °C ‑ Storage Temperature: −40 °C ~ +85 °C ‑ Relative Humidity: 5%‑95 % non‑condensing ‑ Installation Environment: Control cabinet interior, Pollution Degree 2 ‑ EMC: Designed for power‑plant cabinet EMI and switching‑transient conditions
Mechanical Data
‑ Physical Dimension: approx 259 mm × 201 mm ‑ Mounting: Standard slot installation inside Mark‑V protective rack ‑ Weight: approx 2.27 kg
Core Functions
- Hardware emergency trip execution: Receives trip‑voting commands from triple‑redundant control cores and hard‑wired field emergency‑stop inputs, energizes / de‑energizes trip solenoids to shut off fuel and steam supply for turbine protection.
- Field trip‑signal interface: Processes discrete hard‑wired trip signals including local emergency stop, cabinet fault and other safety interlock conditions.
- Modular relay design: 21 plug‑in relays allow individual relay replacement without removing the complete board, improving maintenance efficiency.
- Self‑diagnosis & status indication: Built‑in self‑test monitors relay and circuit health; LED indicators give visual status for commissioning and troubleshooting safety faults.
- Signal interconnection: Multi‑pin ribbon‑cable headers exchange trip‑request and diagnostic status between TCTG and R/S/T core control boards.
Installation, Replacement & Critical Warnings
- Complete system power‑down and lock‑out procedure required before servicing. Non‑hot‑swappable. ESD wrist‑strap protection is mandatory when handling the PCB assembly.
- Record all original jumper positions and verify relay part numbers before replacement. Mismatched relays or incorrect jumper settings may result in unintended turbine trip or complete loss of shutdown protection.
- Secure all ribbon‑cable and field‑solenoid wiring connections firmly; loose connections can cause spurious trip events or failure to execute emergency shutdown.
- After power restoration, perform full safety‑loop test: simulate trip conditions, verify relay action, solenoid drive response and LED diagnostic status.
-
Common failure mode: Relay contact wear is the dominant failure mode; surge from solenoid coils may also damage on‑board circuits. Inspect relay contacts during routine overhaul.