Description
Hardware & Electrical Specifications
‑ Model: IC695CPE310‑ABAB ‑ Part Number: IC695CPE310‑ABAB ‑ Module Type: RX3i Mid‑range CPU Controller (Rev‑ABAB, Firmware V7.11) ‑ Mounting: Any slot on RX3i universal backplane; CPU cannot be installed on expansion backplanes ‑ Backplane power consumption: • +3.3 VDC: 1000 mA • +5 VDC: 1000 mA; maximum 1500 mA under full USB load ‑ User memory: 10 MB Non‑volatile Flash, program and data retention without battery ‑ Logic execution speed: 0.072 ms / 1000 Boolean instructions ‑ I/O capacity: • Discrete %I / %Q: 32 K bits • Analog %AI / %AQ: 32 K words each ‑ Built‑in communication interfaces: • Ethernet RJ45 10/100 Base‑TX: Modbus‑TCP, EGD, SNP; maximum 2 programming connections • COM1 RS‑232: SNP‑Slave, Modbus‑RTU Slave • COM2 RS‑485 half‑duplex: Modbus‑RTU Master/Slave, SNP‑Slave • USB‑Host Type‑A: Firmware upgrade, program backup and restore ‑ RTC real‑time clock: Maximum drift 2 seconds per day; internal lithium backup battery with typical 5‑year service life ‑ Expansion capacity: Maximum 8 local expansion racks ‑ Optional accessory: IC695ACC400 Energy Pack (emergency power supply for power‑loss data write) ‑ Diagnostics: CPU hardware self‑test, backplane bus fault detection, I/O fault monitoring, memory checksum verification, Ethernet port status diagnosis ‑ PCB treatment: Conformal coated for dust, moisture and corrosion resistance ‑ Compatibility note: Hardware drop‑in compatible with IC695CPE310‑AAAA / ‑ABAC. Firmware V7.11 corrects flash write and low‑baud‑rate serial port defects of early revisions. Verify firmware version after replacement; firmware upgrade is required if necessary. CPU hot‑swap is forbidden. Full system download and I/O validation test must be performed after replacement.
Environmental Specifications
‑ Operating temperature: 0 ℃ ~ +60 ℃ ‑ Storage temperature: ‑40 ℃ ~ +85 ℃ ‑ Relative humidity: 5%‑95% non‑condensing ‑ Installation location: Indoor control cabinet, IP20 protection class ‑ EMC compliance: IEC 61000‑6‑2 ‑ Certifications: CE, UL Class I Div 2 hazardous‑location certification
Mechanical Data
‑ Weight: approx 0.34 kg ‑ Dimension: RX3i single‑slot CPU module form‑factor ‑ Handling note: ESD‑sensitive processor circuitry. Periodically inspect RTC lithium‑battery aging status. USB‑Host port is only for USB storage devices; direct PC programming via USB is not supported.
Main Functions
- Main processing unit for RX3i system. Executes IEC 61131‑3 user logic and floating‑point arithmetic. Controls local and expansion‑rack I/O via dual PCI / serial backplane bus.
- Multi‑protocol communication ports: Ethernet for SCADA host connection and Modbus‑TCP devices; RS‑232 / RS‑485 for Modbus‑RTU field instruments and multi‑PLC interconnection.
- USB‑Host supports on‑site firmware upgrade, program backup and restoration without programming computer.
- User program and data stored in non‑volatile flash without battery. RTC clock maintained by onboard lithium battery. Optional Energy Pack enables instant persistent data storage upon power failure.
- Front‑panel LED indicators: ‑ Green CPU OK: CPU hardware status normal ‑ Red FAULT: Hardware / memory / configuration fault ‑ Green RUN: User program executing ‑ I/O FORCE: I/O force function active ‑ Ethernet / COM1 / COM2: Communication activity status
Installation & Wiring Requirements
- Cut off full rack power supply before replacement. CPU hot‑swap operation is strictly forbidden. ESD protection must be applied during module handling.
- Insert IC695CPE310‑ABAB into RX3i universal backplane slot and engage locking latch. Install optional IC695ACC400 Energy Pack if required.
- Network and serial wiring shall comply with GE RX3i hardware manual. Use shielded twisted‑pair cable for RS‑485 bus; install terminating resistor at bus end. Reliable protective ground connection is required.
- After replacement: Power‑on rack power, check CPU OK / RUN / FAULT LED status. Download hardware configuration and user application program. Complete I/O mapping validation and all communication link tests.
- Replacement note: Confirm firmware version V7.11. Check total backplane power‑supply load budget. Inspect RTC battery health. Full‑system commissioning test is mandatory before putting into service.





-300x300.jpg)


Reviews
There are no reviews yet.